WBN / Planning paths

Engineering planning

Follow a complete engineering task through its inputs, references and evidence. Keep the open conditions attached to the connection.

Choose the system you are planning.

A useful record separates three things.

Requirements

What the connection must do.

Name both endpoints, the operating mode and the installed path. Keep each source revision with the requirement it supports.

Observations

What was actually checked.

Record measurements and test conditions against the exact hardware and software configuration. Keep estimates separate.

Open conditions

What still needs evidence.

Leave missing values unresolved. An empty qualification field is more useful than a conclusion borrowed from another configuration.